BILL No 1- GENERAL ITEMS

Sr.No.

Description

Unit

Quantity

Rate

Amount

 

In Figure

In Word

1.01

Establish, operate and maintain field laboratory as per MORT&H Specification 120 including 1 number of Nuclear Moisture Density Equipment (MORT&H Specification 111.7), owned by the contractor.

Lab. Month

44

 

 

 

1.02

Provide 4x4 WD  minimum 120 PS engine power two nos of vehicles with A/C  for  use by the site engineer from PIU Engineer including driver, fuel etc. as per Technical  Specification clause 123

Months

96

 

 

 

1.03

Provide Digital Photographs with GPS coordinates, date and time as per special provisions  -100 photographs/set as per  Technical  Specification clause 124

No. of sets

250

 

 

 

1.04

Supply of set of edited master video cassette of important site activities with 4 copies  thereof, complete  as per MORT&H Specification 121

No. of sets

20

 

 

 

1.05

Clearing road side vegetation, brush wood mooli bamboos, overgrown grass, removal of land slides/debarriesof about 10 cum at a place ,Restoration of Rain Cuts,Filling Pot- holes with approved hard material and Patch Repairs with open - graded Premix surfacing,  20mm. and  temporary restoration work with form of a palasiding with empty bags filled with approved quality earth/sand/moorum/gravel etc as per  Technical  Specification clause 125.

km-month

672

 

 

 

1.06

Roadside Amenities
Construction roadside Amenities including excavtion of foundation, laying of M15 PCC ,brick masonry (1:3) ,plastering of wall 12mm thk (1:3) ,stone Masonry (1:4) ,Centering and shuttering including strutting,propping and removal of form, fifting of watersupply ,door ,window& electrical fitting complete as per Drawing & CPWD Specifications

 

 

 

 

 

PUBLIC TOILET

No.

1

 

 

 

PUBLIC URINAL

No.

8

 

 

 

BUS SHED

No.

3

 

 

 

BAZAR SHED

No.

5

 

 

 

1.07

Office building
Construction office building  complete as per Drawing , CPWD Specification & Technical Specification clause No 122.

Sqm

150

 

 

 

 

Total Amount Bill No.1 carried to Summary