Sl No Name of Division Name of Bridge Year of Completion Chainage
(in kmp)
Width
(in m)
Length/
Span
(in m)
Remarks
1 Khawzawl 1 Bailey Bridge over R.Tuichang 1995 20.000 3.00 34.00m/
100 ft
Tripple singlei
2 Bailey Bridge over R.Phalte 2002 60.000 3.00 40.00m/
120 ft
Tripple singlei
3 Bailey Bridge on Kawlkulh to Ngopa road over R.Tuiphal 1987 47.800 3.50 100 ft Constructed by BRO (GREF)
4 Tuiphal Bridge (Bailey Bridge) 1989 47.800 kmp on Kawlkulh-Ngopa-Mimbung road 3.32 100 ft Kawlkulh-Ngopa-Mimbung road is proposed to be handed over to BRO and the required document for handing/taking over under process
1 Khawzawl 5 Tuivai Bridge (single lane BUG Bridge with RCC deck 2003 97.500 km from Kawlkulh and 117.300 kmp on Khawzawl-sinzawl-Thanlawn (KST) road (41.500 km from Ngopa on new road 3.35 255 ft
(77.724m)
load class=24R
The flow of the river changed its line of flow towards Manipur side (Previously on Mizoram side) sicne Monsoon of 2012 and erosion occurs near abutment of Manipur side. Prevention measures found necessary to prevent further damaged